This entire project was a labour of love by everyone involved. It was maybe one of the most stressful undertakings I’ve ever done. Setting up a custom kitchen in 2 days and taking it down in 1 day. All in all the design was superb, I am thrilled Hella decided to invite me to participate in the whole thing.
The planning of this started in the beginning of November 2018, the renovation show was January 11-13 2019. Usually cabinetry takes 6-8 weeks to deliver and we were asking Prestige Custom Millwork to do it in 4 weeks… over the Christmas holiday.
Everything had to be prepared offsite and assembled in the BMO centre. After Eight Interiors supplied all the flooring and tile (check out that backsplash!). Robinson Lighting and Bath hooked us up with some amazing lighting and the sink/faucet.
Dauter Stone installed the beautiful countertops that were gifted to us from CaesarStone.
Hella Design Studios worked with Domaine Furnishings to style the rest of the space as well as the main stage.
I also relied on some of my other trade partners to bring this all together! Special shout out to Terakita Electrical and Bradlee Distributors (loaned us the cooktop for the show)
Photo’s by: MJay Photography
Comments
Comments